This site ticks all the boxes for a dream location for an electricity-intensive industry. The site is located close to the city center of Sundsvall and the new logistics park (estimated to be completed 2024), which means that both manpower and transports are within close reach. As is the relevant infrastructure for electricity, sewage and water.
Available sites
Nacksta
Site type
Greenfield
Area size
65 hectares
Power capacity
150 MW