At site Vivstavarv you have your own port on site and the site is only a couple of minutes away from the airport. The land is zoned and ready for construction, and you have 100 MW of power available within 24 months.
Available sites
Vivstavarv
Site type
Greenfield + Brownfield
Area size
67-90 hectares
Power capacity
100 MW